You need to choose options for product.
Sale
-3%-
files/246d6deccb98c78f28623e5ce12f75b1L.jpg
Industrial Injection Model AEPS
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only) - Built after 12/07/98* Fits E & F Series in this range.
Built from all new internal fuel plungers, nozzles, springs and OE internal and external o-rings. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance. Industrial Injection DOES NOT SHIP THEIR OIL VALVES LIKE SOME! Each injector is calibrated on their state of the art Hartridge HA230 calibration machine to insure true 4cc cylinder to cylinder fuel delivery.
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)
- Regular price
- $179.95
- Sale price
- $174.55
Sale
-3%- Regular price
- $179.95
- Sale price
- $174.55
Sale
-3%Industrial Injection Model AEPS
Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only) - Built after 12/07/98* Fits E & F Series in this range.
Built from all new internal fuel plungers, nozzles, springs and OE internal and external o-rings. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance. Industrial Injection DOES NOT SHIP THEIR OIL VALVES LIKE SOME! Each injector is calibrated on their state of the art Hartridge HA230 calibration machine to insure true 4cc cylinder to cylinder fuel delivery.
FREQUENTLY BOUGHT TOGETHER
-
Low Profile Packout Organizer Brad Nail Tray Dividers (LPNB18)
No reviewsRegular price From $15.00 -
Packout Small Tool Box Insert For Milwaukee M18 FUEL Hackzall (MHZ18 TB)
No reviewsRegular price From $65.00 -
Packout Organizer Insert For Reekon Tools (RTO)
No reviewsRegular price From $25.00 -
Packout Insert For M12 M-Spector Inspection Camera (MBS)
No reviewsRegular price From $45.00