You need to choose options for product.
-
files/XD475_3-HVCD.jpg
The Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.
By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.
Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.
Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.
Features:
- Stock HP and Flow Rating
- Best In Class End-Of-Line Testing Nozzles
- Tested For Flow, Leakage and Needle Lift
- In-Line Error Proofing Incorporated In Assembly Process
- Warranty Info: 2 Year / Unlimited Mileage
XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)
- Regular price
- $164.95
- Regular price
- $164.95
The Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.
By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.
Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.
Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.
Features:
- Stock HP and Flow Rating
- Best In Class End-Of-Line Testing Nozzles
- Tested For Flow, Leakage and Needle Lift
- In-Line Error Proofing Incorporated In Assembly Process
- Warranty Info: 2 Year / Unlimited Mileage
FREQUENTLY BOUGHT TOGETHER
-
Low Profile Packout Organizer Brad Nail Tray Dividers (LPNB18)
No reviewsRegular price From $15.00 -
Packout Small Tool Box Insert For Milwaukee M18 FUEL Hackzall (MHZ18 TB)
No reviewsRegular price From $65.00 -
Packout Organizer Insert For Reekon Tools (RTO)
No reviewsRegular price From $25.00 -
Packout Insert For M12 M-Spector Inspection Camera (MBS)
No reviewsRegular price From $45.00